Bridge inspection slated for Sanibel Causeway

A Florida Department of Transportation consultant will perform inspections on Structure A of the Sanibel Causeway Bridge over the San Carlos Bay on Nov. 10 from 10 a.m. to 3 p.m.
The work will be conducted over the bridge on a snooper truck.
During this period, the FDOT will do several “lane shifts” to accommodate the truck and the bridge’s inspection equipment on the required locations. As a result, traffic will be slowed down.
For more information, contact Avelino Cancel at 239-533-9400.