×
×
homepage logo
STORE

Sewer main repair project on El Dorado Parkway

By Staff | Mar 1, 2016

A contractor with the city of Cape Coral Utilities Department will be repairing a damaged sewer main on El Dorado Parkway beginning Thursday, March 3. Insituform Technologies LLC will excavate and replace the damaged pipe. The work will take about three weeks and will cause some inconvenience for drivers.

The point repair is 1241 El Dorado Parkway. The work area includes the intersections of Del Prado Boulevard, El Dorado Parkway E., Mikado Court and El Dorado Court. Roads will remain open to local traffic, which will be directed through the work zone.

Insituform Technologies LLC has been conducting rehabilitation and repair of portions of the city’s gravity sewer system using its innovative process of installing a pipe within a pipe. While the process typically does not require any open cuts in the road or excavation of pipe, this section of sewer pipe on El Dorado is too damaged and is not a good candidate for the in-place rehab process.